What office tenants should know about electrical installation licences in Singapore

An office renovation that adds circuits, distribution boards or equipment does not exempt you from electrical licensing obligations. Singapore's Energy Market Authority (EMA) distinguishes the installation licence held by the consumer or owner from the individual Licensed Electrical Worker (LEW) who carries out or supervises the work. This guide explains which questions to settle with your LEW and landlord before agreeing the electrical scope.

Installation licence and LEW licence are different things

EMA describes an electrical installation licence as applying to the installation itself, held by or on behalf of the consumer or owner. A separate Licensed Electrical Worker licence is held by the individual who carries out or supervises electrical works on the installation.

The installation licence concerns use, operation and maintenance of an installation that falls within the licensing scheme. The LEW licence identifies the individual authorised for work within that licence class and its conditions. Check both the installation coverage and the person responsible; a contractor company name does not identify the appointed LEW.

EMA: electrical installation licences

EMA: worker licences

Non-domestic approved load exceeding 45 kVA

EMA's installation licence page describes the licensing requirement for non-domestic electrical installations with an approved load exceeding 45 kVA. The threshold is exceeding, not equal to or greater than. An office with an approved load at or below 45 kVA has a different position from one that exceeds it.

Approved load describes the load the installation is designed to handle. It is not your energy consumption, bill total or a simple sum of appliance ratings; kW and kVA are not interchangeable labels. Ask the appointed LEW to verify the approved load from the installation records and the actual supply arrangement. Do not open a distribution board or calculate an approved capacity yourself.

Below 45 kVA is not permission to do your own wiring

A non-domestic installation with an approved load at or below 45 kVA may not require an installation licence in its own right, but that does not mean anyone can carry out electrical works on it. EMA describes electrical works as needing to be carried out or supervised by an appropriately licensed LEW. The distinction is about the installation registration, not about whether the work itself needs a qualified person.

Adding circuits, replacing a distribution board, extending wiring for partitions or installing new lighting in an office requires a person who holds the relevant LEW class for the voltage and scope. Do not design, build or inspect your own distribution board layout based on an online calculator or a general guide.

EMA: engaging licensed workers

LEW worker classes: design and operation limits differ

EMA's class table separates an electrician, electrical technician and electrical engineer. In the technician row, the approved-load limits for design and operation differ; this is not a distinction between design and operating voltage limits. The table also states voltage limits and licence conditions.

Ask the proposed LEW to confirm the class, current licence and whether it covers your actual installation and work. Refer to EMA's engaging-licensed-workers table rather than choosing a worker class from floor area or a room count.

EMA: worker classes, approved loads and voltage limits

Hazardous-trade and temporary-work provisions

The exceeding-45-kVA threshold is not the whole installation-licensing scheme. EMA also lists installations used in hazardous trades, including construction work activities, regardless of approved load, and supply installations using a consumer's own generators for non-domestic purposes regardless of load. Ask the appointed LEW which category covers the actual arrangement.

For temporary power during renovation, identify the installation, licence coverage and responsible LEW with building management before work starts. Do not assume the normal office supply automatically covers the worksite arrangement. The applicable inspections and arrangements depend on the installation; this guide gives no temporary-wiring design.

Consumer and owner responsibilities

EMA identifies the consumer or owner of the installation as the party responsible for maintaining a valid installation licence where one is required, appointing an LEW for the required testing and maintenance, and keeping the installation records current. In an office lease, the tenant and landlord should establish which party holds these responsibilities for the tenanted space.

Ask the landlord or building management for the existing installation details before scoping the electrical work. If the office renovation changes the load, the number of circuits or the distribution arrangement, the installation records may need updating. This is a responsibility to assign, not something a renovation quotation settles by itself.

Do not assume every tenant must hold a separate licence. EMA's application guidance distinguishes a unit without a separate SP Services account and the specific en-bloc electricity-purchase arrangement covered by the landlord or MCST's building installation licence. Ask which licence actually covers your space and who holds the installation responsibilities; a landlord invoice alone does not settle every arrangement. If a different LEW performs modifications, EMA says that person must coordinate with the appointed LEW and hand the work over for operation and maintenance.

EMA: licence application and multi-tenant arrangements

EMA: modification works and appointed LEW

EMA: licensee and LEW responsibilities

Landlord and LEW document checklist

Before agreeing the electrical scope of an office renovation, prepare the following information and discuss it with your LEW and landlord. This is a planning checklist, not a DIY design tool.

Electrical scope planning checklist for office renovation
ItemWho provides itWhy it matters
Existing approved load and installation licence statusLandlord or building managementEstablishes the licensing position and whether any change affects the installation licence
Current single-line diagram of the tenanted spaceAppointed LEW, with landlord records where applicableShows what circuits exist and where the supply originates
Proposed additional circuits, outlets and equipmentTenant and project designerDefines the scope that the LEW needs to assess
LEW class and licence numberThe LEW engaged for the workConfirms the person is licensed for the proposed voltage and scope
Building or landlord fit-out rules for electrical worksBuilding managementMay restrict the type of work, working hours or require separate approval
Temporary power supply arrangements during renovationLEW and building managementPrevents unplanned site loads on the existing supply

How this relates to an office renovation with Omni Contractors

Include the proposed electrical work in the office-renovation brief, then confirm the electrical contractor, the appropriately licensed LEW, who appoints that person and who keeps the installation records. Ask for those responsibilities and any separate costs in writing; a general renovation quotation does not establish a licence or professional appointment.

Send Omni Contractors the proposed room layout, intended equipment locations and building information to discuss the construction scope and its interfaces with the electrical work. The LEW must assess electrical design, licensing and testing; this guide does not establish an in-house LEW or licensing service for Omni.

Office renovation power and data checklist

Office lighting renovation planning

Cooling and ventilation coordination

Commercial renovation approvals

Discuss an office-renovation scope

Contact Omni Contractors

Sources and scope

Prepared on 18 October 2026. This guide is a planning aid for office tenants, not a licensed electrical design, a load calculation or a substitute for professional LEW advice.

EMA: Electrical Supply/Installation Licences, read 18 October 2026. Describes the installation licence requirement, the non-domestic exceeding-45-kVA threshold and consumer responsibilities.

EMA: Worker Licences, read 18 October 2026. Describes LEW classes, voltage and scope limits, and the requirement for licensed persons to carry out or supervise electrical works.

EMA: Engaging Licensed Workers, read 18 October 2026. Consumer guidance on engaging an LEW.

EMA: Electrical Supply/Installation Licences

EMA: Worker Licences

EMA: Engaging Licensed Workers

FAQ

Electrical installation licence questions

Question not listed? Ask us on WhatsApp

Does every office need its own electrical installation licence?

Not necessarily. EMA lists non-domestic installations exceeding 45 kVA, hazardous-trade installations regardless of load, and non-domestic supply installations regardless of load. The licence coverage can also depend on the building's supply arrangement. Ask the appointed LEW and landlord which licence covers your space; the 45 kVA figure alone does not settle every case.

Can I install new circuits or a distribution board in my office without an LEW?

No. EMA describes electrical works as needing to be carried out or supervised by an appropriately licensed LEW regardless of the installation's approved load. A lower load does not exempt the work from requiring a qualified person.

Is the approved load the same as my electricity bill total?

No. Approved load concerns the load the installation is designed to handle; an electricity bill records consumption and charges. Do not infer approved kVA by adding appliance ratings. Ask the appointed LEW to verify the installation records and supply arrangement.

Who should appoint the LEW during an office renovation?

Identify the installation licensee and existing appointed LEW with the landlord or building management, then put the construction and electrical appointments in writing. If a different LEW carries out modifications, EMA says that person must coordinate with the appointed LEW and hand over the work for operation and maintenance.

Free quotation

Tell us about your unit.

We quote on the actual scope. These help us get it right the first time:

  • Floor plan or unit size
  • Photos of each room and the ceiling
  • Required rooms, proposed layout and building fit-out rules
  • Handover or move in date

Send us the details

Send photos, the floor plan, room requirements and target move-in date so we can discuss the office renovation scope.

WhatsApp 8368 2943 Call +65 9475 1494 Email us